Castilla-La Mancha

Key information

Location: Castilla-La Mancha, Spain

Project Length: 12-24 months

Waste Stream: Animal manure and crop waste

Biogas Project Size: 2000 m3 / h

Biogas Plant Construction

Together with the Ecomethane SL team an 8 biogas tanks plant will be constructed as part of an industrial waste-to-energy project in the region of Castilla-La Mancha starting this year. Feasibility studies, both with our knowledge in the field, and sampling conducted during the study,  will help us determine with more accuracy exactly how much biogas we are expected to produce, and what types of substrates they can dispose of.